“smartGreen” SWIMMING POOL – T.A.B.S. and heat pump
Result of the Termoline Research Center: under-pool insulation foam glass; 200 mm extruded polystyrene perimeter; water heating by thermoactivation of the concrete structure, DIMPLEX heat pump, ventilation and dehumidification. The water is indirectly heated by the T.A.B.S. mounted in the concrete structure.
ARANY JANOS SALONTA HIGH SCHOOL – HVAC with 180 kW heat pumps
In the project ARANY JANOS SALONTA HIGH SCHOOL we implemented: brine to wter and water to water heat pumps -DIMPLEX >180 kW; air treatment and ventilation with heat recovery with AHU Mandik 4 x 6.000 m³ / h;
”smartGreen” HOUSE – 300 m², heat pump 8 kW, 2 geothermal probes 80 m
Result from the research of the Termoline Research Center: the insulation as for passive houses; DIMPLEX 8 kW heat pump; passive cooling – using geothermal probes; T.A.B.S. system ; DIMPLEX AHU – Passivhaus certificate.
HOUSE and SWIMMING POOL – 1.070 m²: heat pumps 60 kW
The project ”House ans swimming pool” – 1.070 m² part of the ” smartGreen ” projects – the result of the research of the TERMOLINE research center. We use 2 geothermal DIMPLEX heat pumps for heating – cooling the house and heating the pool and ventilation with heat recovery